SP5 Marc D.Turpin,
1968/1969
2nd Platoon, 1st Squad
Page 7 of 8
Ben Tre' Soccer Field FSB (Fire Support Base)
1 - Area outside FSB
2 - Outside perimeter
3 - US buildings constructed later
4 - Village hooches
5 - Building bunkers
1 - First temporary
bunker
2 - Entrance to the Soccer Field
3 - Going across last bridge standing to Ben Tre'
4 - Outside perimeter
5 - 1/84th Artillery 155mm howitzers (Foreground - full recoil)
1 - Entrance to Ben
Tre' Soccer Field and FSB
2 - Culvert
3 - Relaxing with 1/84th Arty guys
4 - photo of chopper landing. 1/84th in background
5 - Moving Out with tool trailer in tow
How to Build a Barracks
1 - Marc Turpin
using Pick-matic
2 - Bucket loader prepping the site
3 - Lots of muscle to
set footers coutesy of Ronald Golemboski
4 - Prepping concrete slab - no names
5 - Screeding cement - wooden screed in forground, recent pour in background
1 - Setting walls
2 - Second floor rafters
3 - Second floor
4 - Laying second floor decking
5 -Setting second floor walls - screening for first floor in place
1 - Installing side
vents
2 - First floor done, second floor ready for exterior vents/siding
3 - Second floor end siding - Marc Turpin and John May
4 - Marc and Gary Strader finish end siding
5 - Another view. OSHA would not approve this scaffolding
1 - Daredevils
2 - Communications tower adjacent to barracks
How to Retrieve a Road
Grader in the Drink (Don't Ask)
Near FSB David Ferry Site
1 - Navy diver; visibility in water -
zero
2 - Navy crane on boat fishing for the sunken road grader
3 - Navy divers rigging the grader
4 - "Thar she blow"
5 - Not much to cheer about. The Battalion Motor Pool NCO probably cursed
everyone involved for the next two weeks
Return to Website
entry page - Home
Go to Page 1
Go to Page 2
Go to Page 3
Go to Page 4
go to Page 5
Go to Page 6
You are here: Page 7
Go to Page 8
Go to D Company Photo Page