SP5 Marc D.Turpin, 1968/1969
2nd Platoon, 1st Squad


Page 7 of 8


Ben Tre' Soccer Field FSB (Fire Support Base)

web-MT Page7-1.jpg (84434 bytes)          web-MT Page7-2.jpg (129682 bytes)          web-MT Page7-3.jpg (139392 bytes)          web-MT Page7-4.jpg (265597 bytes)          web-MT Page7-5.jpg (290082 bytes)

1 - Area outside FSB
2 - Outside perimeter
3 - US buildings constructed later
4 - Village hooches
5 - Building bunkers

web-MT Page7-6.jpg (219812 bytes)          web-MT Page7-7.jpg (259974 bytes)          web-MT Page7-8.jpg (231750 bytes)          web-MT Page7-9.jpg (264939 bytes)          web-MT Page7-10.jpg (207956 bytes)

1 - First temporary bunker
2 - Entrance to the Soccer Field
3 - Going across last bridge standing to Ben Tre'
4 - Outside perimeter
5 - 1/84th Artillery 155mm howitzers (Foreground - full recoil) 


web-MT Page7-11.jpg (296826 bytes)          web-MT Page7-12.jpg (250981 bytes)         web-MT Page7-13.jpg (202132 bytes)          web-MT Page7-14.jpg (274637 bytes)          web-MT Page7-15.jpg (336249 bytes)

1 - Entrance to Ben Tre' Soccer Field and FSB
2 - Culvert
3 - Relaxing with 1/84th Arty guys
4 - photo of chopper landing. 1/84th in background 
5 - Moving Out with tool trailer in tow

How to Build a Barracks

 

web-MT Page7-18.jpg (86435 bytes)           web-MT Page7-16.jpg (84247 bytes)          web-MT Page7-17.jpg (135469 bytes)          web-MT Page7-19.jpg (87837 bytes)      web-MT Page7-39.jpg (115148 bytes)

1 - Marc Turpin using Pick-matic
2 - Bucket loader prepping the site
3 -
Lots of muscle to set footers coutesy of Ronald Golemboski
4 - Prepping concrete slab - no names
5 - Screeding cement - wooden screed in forground, recent pour in background

        web-MT Page7-21.jpg (107129 bytes)      web-MT Page7-22.jpg (109567 bytes)          web-MT Page7-23.jpg (103490 bytes)          web-MT Page7-24.jpg (87126 bytes)          web-MT Page7-25.jpg (98719 bytes)

1 - Setting walls
2 - Second floor rafters
3 - Second floor
4 - Laying second floor decking
5 -Setting second floor walls - screening for first floor in place


web-MT Page7-26.jpg (109599 bytes)          web-MT Page7-27.jpg (106677 bytes)          web-MT Page7-28.jpg (86313 bytes)          web-MT Page7-29.jpg (75392 bytes)          web-MT Page7-31.jpg (75818 bytes)

1 - Installing side vents
2 - First floor done, second floor ready for exterior vents/siding
3 - Second floor end siding - Marc Turpin and John May
4 - Marc and Gary Strader finish end siding
5 - Another view. OSHA would not approve this scaffolding 


web-MT Page7-32.jpg (85385 bytes)          web-MT Page7-33.jpg (58451 bytes)

1 - Daredevils
2 - Communications tower adjacent to barracks



How to Retrieve a Road Grader in the Drink (Don't Ask)
Near FSB David Ferry Site


web-MT Page7-34.jpg (56842 bytes)          web-MT Page7-35.jpg (102180 bytes)          web-MT Page7-36.jpg (97809 bytes)          web-MT Page7-37.jpg (98357 bytes)          web-MT Page7-38.jpg (103923 bytes)
1 - Navy diver; visibility in water - zero
2 - Navy crane on boat fishing for the sunken road grader
3 - Navy divers rigging the grader
4 - "Thar she blow"
5 - Not much to cheer about. The Battalion Motor Pool NCO probably cursed everyone involved for the next two weeks

Return to Website entry page - Home
Go to Page 1
Go to Page 2
Go to Page 3
Go to Page 4
go to Page 5
Go to Page 6
You are here: Page 7
Go to Page 8
Go to D Company Photo Page